SITE VISITS:
07 15 2006
09 18 2006   >
09 19 2006   >
09 20 2006   >
09 21 2006   >
09 22 2006   >
09 26 2006   >
09 28 2006   >

10 04 2006   >
10 05 2006   >
10 10 2006   >
10 12 2006   >
10 17 2006   >
10 20 2006   >
10 30 2006   >
11 03 2006   >
 
09 26 2006 >  
All the careful formwork, anchor bolt and rebar placement have paid off. Here we see the finished concrete slab with the anchor bolts poking out the top. Concrete and steel reinforcement have become one mass making this slab super strong. On the top left you can see the four anchor bolts needed to support one pole and the conduit for the electrical wiring. 
lee-koopman projects
prairie wind
construction